Lifua A Development
Operator: CABGOC/Chevron
Location: Block 0, offshore Angola
Lifua field is located in Block 0 – offshore Angola, in approximately 200 feet (61m) water depth, 5 miles (9,3km) Southwest of the Takula Field, 23 miles (42,6km) from the shoreline and 29 miles (53,7km) from Malongo Terminal, in Cabinda.
Lifua A development consists of one stackable template structure (STS) wellhead platform with 6 (six) producer wells and 4 (four) water injection wells.
The Lifua A STS is an unmanned wellhead platform. A Normally Unattended Installation (NUI) is remotely operated. There is no processing equipment on the STS:
- 3 phase production is sent to the existing facilities via a subsea pipeline for oil / gas processing. The oil/water is exported to the Malongo Terminal via the existing 30” diameter pipeline;
- Water injection is provided from the existing facilities (TWIP);
- Power is supplied from the existing facilities (TGPP) via a subsea power cable.
Lifua A control room is based on GS-Mike (Gathering System Mike), where dedicated operators are controlling the facility. Lifua A products are transported via a subsea flowline to GSM, the existing platform in Takula area, for processing.
General Services provided by SACOL on this project:
Audit services as a legal requirement for official issuance of Operating License, including the issuing of a report on Commissioning and Start-up activities of the Lifua A Development, located offshore on Block 0 – Angola.
1 – Chevron/CABGOC documentation reviewed:
- Basis of Design (Platform & Pipelines);
- Project Quality Management Plan;
- Detailed Project Schedule (Load-Out / Offshore Campaign / Commissioning / Start-Up);
- Inspection and Test Plans;
- Project HSE Plan;
- Load-Out and Marine Transportation Procedure;
- Emergency Response Plan.
2 – Project activities witnessed and audited:
- Lifua A STS Platform Mechanical Completion (PDM & DDM), at Malembo yard in Cabinda – Angola;
- Lifua STS Load-Out operation, at Malongo assembly area in Cabinda – Angola;
- Drill Deck Module (DDM) and Production Deck Module (PDM) Load-Out, at Malongo assembly area in Cabinda – Angola;
- STS Offshore Installation, offshore Block 0 – Angola;
- Fire & Gas System Commissioning, offshore Block 0 – Angola;
- Emergency Shutdown System Commissioning, offshore Block 0 – Angola;
- Risers & TUTA Tie-in, offshore Block 0 – Angola;
- Commissioning & Start-Up prior to 1st Oil, offshore Block 0 – Angola;
- MODU Commissioning, offshore Block 0 – Angola;
- Wellhead / WI Tree Installation, offshore Block 0 – Angola;
- Multiphase Metering System Dynamic Commissioning, offshore Block 0 – Angola.