Eni’s East Hub Development Project involves the development of the Cabaça North and Cabaca South-East discoveries located within Block 15 /06, approximately 350km north-east of Luanda, Angola. Combined oil reserves of the two discoveries are estimated at approximately 230 million barrels. A peak production capacity of approximately 17,000bpd net is expected to be achieved from the project in 2017. The start of production from the field will increase the production level at Block 15/06, which also accommodates the West Hub Development Project, to 200,000bpd. The first phase of the three-phased project involves the development of the Cabaça South-East discovery where ten subsea wells will be drilled. The Cabaça North discovery will be developed in the next phase, increasing the total number of subsea wells to 23.

This scope of work consists on the reviewing, assessment and appraisal of all related documents as follows:

FPSO (Bumi Armada)

• Topsides Fabrication (Onshore)

– Construction of Module M15 (Vessel Mechanical Completion

– Inspection and Test Plans

– Welding Maps & Welding Procedures and Specifications

– Welders Qualification

– Non Destructive Testing applied

– Manufacturing Record Books Review

 

• FPSO & Topsides Integration (Onshore)

– Lift & Integration of Module M15

– Turret Integration & Mechanical Completion

 

• Offshore Commissioning

– Commissioning Activities witnessing after Riser Hook-Up

– Commissioning & Start-Up Procedures

– Black Start

– Witness Start-up activities

– 1st Oil

– Oil Export Metering Dynamic Commissioning

– Offloading Systems Commissioning

– Witness Offloading Operation

– Offshore Safety practices and Environmental regulation

 

X-Trees & Manifolds

• Quality Plan (Project Audits & NCR management)

• Inspection and Test Plans

• Welding Maps & Welding Procedures and Specifications

• Welders Qualification

• Non Destructive Testing

• Factory Acceptance Test (FAT) and SRT (Site Receival Testing)

• Manufacturing Record Books Review

• Material Certificates

• HSE practices review during manufacturing and installation

• Offshore Installation

• Subsea Commissioning & Start-Up

 

PLET

• Quality Plan (Project Audits & NCR Management)

• Inspection and Test Plans

• Welding Maps & Welding Procedures and Specifications

• Welders Qualification

• Non Destructive Testing applied

• Factory Acceptance Test (FAT) and EFAT

• Manufacturing Record Books Review

• Material Certificates

• HSE practices review during manufacturing and installation

 

Umbilicals

• Quality Plan (Project Audits & NCR management)

• Inspection and Test Plans

• Welding Maps & Welding Procedures and Specifications

• Welders Qualification

• Non Destructive Testing

• Factory Acceptance Test (FAT)

• Manufacturing Record Books Review

• Material Certificates

• HSE practices review during manufacturing and installation

• Offshore Installation

• Subsea Commissioning

 

SURF – Flowlines Fabrication

• Project Quality Plan (Project Audits & NCR Management)

• Inspection and Test Plans

• Welding Maps & Welding Procedures and Specifications

• Welders Qualification

• Non Destructive Testing applied

• Factory Acceptance Test (FAT) and EFAT

• Manufacturing Record Books Review

• Material Certificates

• HSE practices review during manufacturing and installation

 

Project Document Review

• Document Review of EPC Fabrication/Manufacturing Records

• Document Review of EPC Installation/Commissioning Records

• Final Review of Project Handed Over Documentation

• MinPet Audit Observations review & closure